Affordable WiFi for Everyone!
December 13th 2018
The perfect fit for small & medium businesses
Call Us
July 13th 2018
| Select Telecom in conjunction with ALE is announcing a new SMB offer in July including the new 3.0 software release of OXO Connect and a new OXO Connect Evolution offer. |
| What is hot in the SMB market these days? |
| The recent “IDC FutureScape: Worldwide SMB predictions,” indicates that SMB Worldwide IT Spending will grow 4.5% to $568B in 2018. It means a lot of new opportunities for ALE channels to address in the SMB market. |
| IDC analysts also see that “Integration of On-Prem and Cloud resources will be a Top IT Spend Priority by >50% of SMBs in 2019.” Yes, “hybrid cloud” is growing big. |
| What is the new SMB offer about? |
| Hybrid cloud of course! |
| We’ll offer additional ways for our channels to grow hybrid cloud revenue with stronger integration between OXO Connect and the Rainbow Collaboration cloud. |
| We’ll also improve operations with new Cloud Connect capabilities and analytics. |
| And the OXO Connect Evolution is a new offer that addresses 100% IP markets and takes advantage of the latest ALE LAN and WLAN solutions designed for SMBs. IP in SMB is a strong growth area! |
May 24th 2017
The time was right for a new name. OXO Connect is an evolution in the product, containing enough new content to motivate a rebranding. It offers an extension of up to 300 users in IP, universal license, Alcatel-Lucent Cloud Connect approach, Alcatel-Lucent Rainbow™ UC cloud services./ Please connect for more information on how your current system or a new system can evolve cost effectively.
April 7th 2015
The OpenTouch® Suite for SMB H1 2015 offer has announced the worldwide availability of the new PowerCPU-EE.
All OmniPCX Office RCE R10.1 systems are delivered with the new PowerCPU-EE from April 27, 2015.
The PowerCPU board sold separately is used in the maintenance of a system that is already installed and running OmniPCX Office RCE R8.x, R9.x or R10.0. This PowerCPU board will not be sold after end of the overlap period of the H2 2014 offer, June 12, 2015.